Products

PRODUCT OVERVIEW

Concrete Add Mixture - CAM 100 & Spray Apply Concrete Add Mixture   SA CAM 110

 

CAM 110/SA CAM 110 – With our concrete add-mix and spray applied (mix design, time of placement and existing concrete) we can provide extended life cycles while helping to reduce construction time by 30-40%.


The materials are dosed/applied only once for the Life Cycle of the design. And provide a cost-effective means that give multiple benefits for project design or extending the Life Cycle of infrastructure (i.e.- Bridges, tunnels and roadways). The applications are VOC free and 100% environmentally safe.

By combining the two materials above we can provide solutions for degraded infrastructure that will extend life cycle and eliminate the need for immediate replacement for better funds allocation during project replacement cost review.


We can also provide project application recommendation from a team of materials engineers and design experts.


Please contact us with your project overviews so we can discuss the options and provide you with a complete package of recommendations. Both product can be delivered in 220 liter and 1.000 liter IBC container. Certain min. orders are required. 


Please find below further documents for CAM 110 & SA CAM 110. 

 


  • Visual look when SA CAM 110 was used


Please select this link for download of PDF document


  • Poultry Farm Application 


Please select this link for download of PDF document


  • Heraclex & CAM 110, SA CAM 110 in combination - FACADE & BUILDINGS


Please select this link for download of PDF document  &  UHCP Ultra high Performance Concrete


  • Bridges, Tunnel, Infrastructure 


Please select this link for download of PDF document

HERACLEX – With our Ductile material we can provide an UHPC at 30% of the current existing cost structure to provide a cost effective and time reducing answer for project specific applications (i.e.- Bridge Surface Overlay, Tunnel Resurface and Mix Tank Resurface).


With Heraclex extended Life Cycles of 150-200 years can be designed into new projects to provide extended life cycle savings. While reducing materials need and on-going maintenance cost.

Check out the solution you need help for by following this link

FURTHER PRODUCTS FROM C5 INNOVATION


 Please select the area of intest for you below. A complete palette and know-how is at your service.

CONTACT US NOW FOR A

FREE QUOTE ON YOUR PROJECT